Posted by: springfieldyans | January 13, 2010

Opening the new channel

December was a busy month for the Mill Race crew.  The culvert bridge over the new channel was installed.  The new parking lot was rough graded.  On December 30, the plug was breached and water from the Middle Fork flowed into the new Mill Race.

Excavating for the Bridge Foundations

Culvert Bridge in place

Grading the channel before removing the earth dam

Removing the dam

The first moment of breach - Willamette River flows into the Mill Race

Mill Race filling with Willamette River water