December was a busy month for the Mill Race crew. The culvert bridge over the new channel was installed. The new parking lot was rough graded. On December 30, the plug was breached and water from the Middle Fork flowed into the new Mill Race.
December was a busy month for the Mill Race crew. The culvert bridge over the new channel was installed. The new parking lot was rough graded. On December 30, the plug was breached and water from the Middle Fork flowed into the new Mill Race.
Posted in 1